How to design Optigo Connect Spectra

Download our guide on designing Optigo Connect Spectra for a high-rise building with redundancy. 

Shopping-list-graphics-02

Want to build a bid for a high-rise with redundancy?

You have two options for building redundancy on a high-rise with Optigo Connect Spectra: Aggregation Switch Redundancy or Path Redundancy. Generally, Aggregation Switch Redundancy is sufficient. It ensures that if one Aggregation Switch has a failure, a second Aggregation Switch will continue to drive the building. 

Follow our simple formula for high-rise redundancy, and contact your sales representative for more information and design assistance. 

Download it now